Please confirm the 86309 probe’s compatibility with your aircraft using these documents:
With Alcor’s blanket STC, p/n 86309 can replace many existing Screw-in Type K EGT/TIT probes, including old or obsolete part numbers.
Product Details:
- EGT/TIT Ungrounded Probe, Long Lead
- Thermocouple Type: K – Red and Yellow
- Mount: Screw-in, 7/16″-20
- Stagger: Normal
- Built in radiator
- Resistance: 1.60 Ohms
- Replaces: 86291, 880055-501
- Approved by: EASA-STC (European Union), FAA-PMA, FAA-STC (Modification Article)
- Manufactured by Alcor, Inc.
- Ungrounded probe designed to reduce electrical “noise” in digital indicators
- Small element diameter provides for near instantaneous instrument response
- Built in radiator minimizes the high temperature effects on internal spotweld connections
- Intended for use with Type K EGT or TIT instruments and leads
- Accurate to ± 25 degrees at 1500 degrees Fahrenheit
- PMA and FAA approved for all reciprocating powered aircraft
- Alcor probes are designed, manufactured, and supported in the U.S.A.

MC002-524028-9 Beechcraft Aircraft Flight Control Cable (Elevator Tab) | McFarlane Aviation MC0025240289 